Voltage generated from the gas turbine generator and steam turbine generator is still low so the voltage should be sent in advance to the main transformer 11.5 / 150 KV to increased tension. 150 KV voltage generated from the main transformer 11.5 / 150 KV transmission subsequently flowed through the poles in the switch yard and then sent to the substation through a transmission voltage and extra high voltage.