Electric Power Distribution Process
Voltage generated from the gas turbine generator and steam turbine generator is still low so the voltage should be sent in advance to the main transformer 11.5 / 150 KV to increased tension. 150 KV voltage generated from the main transformer 11.5 / 150 KV transmission subsequently flowed through the poles in the switch yard and then sent to the substation through a transmission voltage and extra high voltage.
No comments:
Post a Comment