Transmission and Substation Management

Good Management of transmission and substation have five parts: 

1. Preparation Businesses  

Before the given voltage substation and bears (on the operation of the new substation is completed in the wake) than previously stated by the maintenance team (which is installing and testing) that the substation is ready to operate. All equipment (power transformers, breakers, the source of direct current and so are qualified to operate. Does relay settings are in accordance with prescribed, firefighting equipment, are already eligible, the work equipment does not interfere with the operation and was kept in place. After that report is ready for operation. 

2. Supervision and Examination  

Careful supervision at the location of substations that are running is to prevent interference with power distribution and damage to equipment, among others: • Control of interference of external factors Disorders that arise are caused by humans, animals, plants and others. • Supervision factors disturbance inside. Disorders that arise are caused by factors within the existing equipment at the substation. • communication systems, direct-current source system, fire extinguishing system must always be good in every operation. 

3. How to turn off or Free Voltage at substation  

How to turn off and relieve stress on the sub station is as follows: that is, remove all load breakers, cables, and then dividing and then enter the soil separator of each breaker that has been removed, remove the power transformer, remove the breaker Conductor later separation. When the Conductor is no voltage divider again enter the land (if necessary). 

4. Concession Boundary
 
Regarding the limits of exploitation of the equipment to look at the manual operation, exercise and maintenance of equipment.